This message is generated in the information log when a schedule is being generated and the time-block (operation) has a due date which is beyond the schedule period setting in Redant. This setting can be changed from within the Finite Scheduler module by selecting Setup from the top menu, followed by Schedule Period. We recommend a setting of 120 days as a forward schedule period.
The above message is only for information purposes and can, in most circumstances, be ignored.